Ironbark
#1 AI ops for commercial builders
See the demo
Purpose-built for commercial construction

Every report written.
Every subbie chased.

Ironbark's AI ops layer auto-compiles weekly project reports, classifies compliance documents, coordinates subcontractors and structures on-site progress-photo capture — quietly running site admin so your PMs stay on the build.

Works with Procore and your current systemsAustralian built for sites & subbies
ironbark.app / dashboard · Harbour Tower + 49
Portfolio · Q1 2026
Today across Ironbark
AI live
Active sites
0
Reports auto-drafted
0
RFIs open
0
Compliance
100%
06:12
Harbour Tower · L7
Weekly report drafted from Procore logs — 2 photos pending
AI DRAFT
07:40
Barangaroo Fit-out
Coastal Concrete unconfirmed for Thu 0500 pour — chasing
WATCH
08:05
Northshore Medical
Apex Plumbing White Cards expire in 4 days · 2 workers
P1
What you get

An AI ops layer for every part of the build.

Four connected agents that quietly run reports, compliance, subbies and on-site capture — so your PMs, site managers and clients get the same signal without the paperwork.

Automated Reporting

Weekly project reports written for you — from the logs your team already keeps.

Ironbark pulls Procore daily logs, RFIs and photo captions into a clean site-manager-ready report every Friday. You read and approve — you don't write.

  • Compiles from Procore, Slack and Google Docs
  • Client-branded PDF ready to send by 4pm Friday
  • AI flags what changed vs. last week
Open Automated Reporting
Weekly report · Harbour Tower · Wk 07
AI DRAFT
Level 7 slab poured on schedule. Façade panels 3 days ahead.
Coastal Concrete completed the L7 pour Wed 0500. Northface delivered 42 panels; 14 hung by EoW. RFI-218 (structural) still open — 3 days.
Progress22 photos9 RFIs0 incidents
Compiled from 214 log entries in 45 seconds Saved 7.5 hrs
Compliance Hub

Classifies every doc — SWMS, White Cards, CoCs, insurance — the minute it lands.

AI reads incoming subbie paperwork, tags it, files it against the right project and worker, and pings the PM 14 days before anything expires.

  • White Card, SWMS, SafeWork induction, CoC, PL insurance
  • Auto-linked to workers, projects & site inductions
  • Zero audit gaps across 50+ sites
Open Compliance Hub
Compliance queue · auto-classified
4 items
Apex Plumbing · White Card
S. Nguyen
4d
Coastal Concrete · SWMS v3
Crew A
28d
Northface Facades · CoC
Panel L7
62d
Sparkline Elec · PL Insurance
Company
11d
Subcontractor Coordination

Chases confirmations from concreters, sparkies & crane crews — so you don't.

Ironbark tracks who's booked for what and follows up over SMS + email until every trade has confirmed. Escalates to the PM only when it's stuck.

  • Auto follow-up 72h, 48h and 24h before pour or lift
  • Live subbie confirmation board across the portfolio
  • Slack alert only when human judgement is needed
Open Subcontractor Coordination
Subbie board · next 7 days
AI CHASING
Thu 05:00
Coastal Concrete
L7 slab pour
Chasing
Fri 07:00
Sparkline Elec
Basement rough-in
Confirmed
Fri 12:00
Boom Cranes
Panel lift 14–24
Confirmed
Mon 06:30
Apex Plumbing
Riser drop L3–6
Awaiting
Mobile Capture

On-site photos, captioned and filed the moment they leave the phone.

Site teams snap on the iPhone app; AI tags the level, trade and activity code, then drops it into the right project album — ready to appear in Friday's report.

  • Auto-caption: level, trade, activity code
  • Streams straight into Procore + weekly report
  • 32 devices live across current sites
Open Mobile Capture
Site capture · today
128 photos
Formwork site capture
L7
Formwork
FW-207
Concrete site capture
L4
Concrete
CN-104
Electrical site capture
B1
Electrical
EL-B12
Steel Fix site capture
L2
Steel Fix
SF-208
Formwork site capture
L7
Formwork
FW-207
Plumbing site capture
L1
Plumbing
PL-118
Designed impact

Built to move the numbers that matter.

Figures below are illustrative of Ironbark's intended performance and typical commercial construction benchmarks — not verified client outcomes.

Admin overhead
0%

Site-admin hours cut across 50+ active projects.

Report prep
0m

From 8+ hours per project — every Friday, done by 4pm.

Annual saving
$0k

Across the portfolio, from admin and chased-down delays.

Subbie delays
0%

Quarter on quarter, after Ironbark starts chasing.

How it works

Live on your sites in ~14 days.

01
We map how your PMs already run a site

A short workshop with the delivery team. We capture your reporting template, subbie roster, compliance checklist and the systems you actually use.

02
We wire Ironbark into your stack

Procore, Make, Google Workspace and Slack connected. Historic project data ingested. On-site iPhones enrolled for photo capture.

03
You go live — AI runs the paperwork

Weekly reports draft themselves. Compliance is watched. Subbies are chased. PMs review and approve — everything else is quiet automation.

Built for commercial construction

One platform, shaped for builders.

Ironbark is designed around the workflows, cadences and compliance load of these teams.

Commercial Towers

Multi-level structure and façade builds where a slipped pour or missed panel lift compounds fast.

Fit-out & Refurb

Trade-heavy programmes juggling 20+ subbies where paperwork buries the PM every Friday.

Civic & Health

Government-grade compliance and reporting cadence — no gaps, no late submissions, ever.

Head Contractors

Portfolios of 30–100 active sites where consistency across PMs is the real productivity lever.

See it live

Ready to see Ironbark run the paperwork on 50+ sites?

Open the clickable demo — every screen is wired up with realistic sample data so you can walk through it exactly as a site manager on the Ironbark delivery team would.

Always on
Always answered.
Friday 16:00 · report draft ready — Harbour Tower
02:14 · White Card renewals sent to 2 subbies
05:47 · Coastal Concrete confirmed L7 pour